Night Works – Dawson Parade, Keperra
Night works at Dawson Parade, Keperra
Urban Utilities is committed to excellence in water and wastewater services that enhance the liveability of our communities. As part of this commitment, they will soon commence replacement of a section of water main along Dawson Parade, Keperra.
What’s happening?
Urban Utilities delivery partner, Diona, will soon commence works to replace and reline sections of water mains along Dawson Parade, between Kane Street and Madsen Street, Keperra.
Construction will commence from Monday 6 January 2025, and will take up to six weeks to complete, weather and site conditions permitting. These works will take place at night between 7:00pm and 5:00am, Sunday to Thursday.
Why is this happening?
Urban Utilities are upgrading sections of water pipe near your property that are nearing the end of their service life and are made from asbestos cement. Upgrading the water pipes will ensure the reliability and sustainability of the water network is maintained for decades to come, and we to keep the water moving to your taps.
What to expect?
- Night works – Most of the work will take place at night between 7:00pm and 5:00am, Sunday to Thursday, weather and site conditions permitting.
- Crews, trucks and equipment – During construction, nearby residents and businesses may experience increased vehicle movements from heavy machinery and minor vibrations. We’ll minimise this where we can. Safety barriers will be in place to keep everyone safe.
- Noise/dust – Residents may experience varying levels of noise and dust from construction machinery and changed vehicle movements. We’ll minimise these where we can.
- Safety fencing, barriers and signage will be installed around work areas to keep everyone safe.
- Water outages – To complete this important work, there may be short-term, temporary interruptions to your water supply. The community will be notified in advance of any water interruptions. Keep an eye out in your letterbox for updates.
- Changed traffic conditions including lane/road closures and detours will be in place around work areas and access roads. Traffic control will be in place to manage the flow of traffic, ensure pedestrian safety and maintain local access. Please take care and observe all signage, speed limits and any directions given by Traffic Controllers.
- Asbestos Removal – There are no health risks associated with drinking water that has been transported in asbestos cement pipes. Our licensed asbestos removers will safely remove any asbestos cement and dispose of it at a licensed waste facility. For more information on asbestos pipes, visit: urbanutilities.com.au/network-upgrades/current-projects/water-main- replacement-works-asbestos-cement-pipes-information-page
- Temporary site compound and holding area – A temporary compound will be located on Kane Street, between Dawson Parade and Callan Street, Keperra. This area will be used to store essential project materials and machinery during construction.
- Restoration – We’ll restore all work areas as close to the original condition as possible, once the work is complete